Author Topic: Start of Challenge 101  (Read 150 times)

Bill Gruby

Start of Challenge 101
« on: September 01, 2019, 06:37:37 AM »
 It begins now . You have 60 days to design and post what you intend to build for this challenge. You must post your name and what the project is in this post only. Just your name and project name, that's  all. Any discussion is to be done in the Challenge 101 thread. You have until Oct. 30th.  Remember this is the design phase, but you may  start building once the project is posted. Have fun fellas.

 "Billy G"
Don't sweat getting old, you'll still do dumb shit, just slower.

An Optimist will tell you the glass is half full, the pessimist half empty, the engineer will say the glass is twice as big as it needs to be.

Bill Gruby

Re: Start of Challenge 101
« Reply #1 on: September 01, 2019, 08:07:27 AM »
 Bill Gruby ---- Single Cylinder 4 stroke I. C. Engine ____ Plans by Dale Detrich.  This is a non entry build.
Don't sweat getting old, you'll still do dumb shit, just slower.

An Optimist will tell you the glass is half full, the pessimist half empty, the engineer will say the glass is twice as big as it needs to be.

Carpenter84

Re: Start of Challenge 101
« Reply #2 on: September 02, 2019, 07:11:14 AM »

Shawn Huk - brass socket hammer for the mill draw bar.

« Last Edit: September 02, 2019, 07:17:55 AM by Bill Gruby »
Shawn

First 9x42 column mill,
Enterprise 10x28 lathe,
Ko Lee 6x12 surface grinder,
Airco dip/stick 160 welder,
Fully stocked wood shop.